Working partnership between the companies Achelis and Ossberger for the upgrade of the existing hydropower turbine and installation of a second turbine with the same output capacity in Rwanda in order to double the capacity of the hydropower station. The project included construction work, supply of materials, and the installation and commissioning of the turbines.
Erection of 56,2km MV overhead transmission and 61km LV distribution lines, including 42 transformer stations and 3670 customer connection. Execution of contract within 15 months.
Main part was repair of reserve transformers (year of production) to reduce risk of power cuts for the countries Rwanda, Congo and Burundi. Furthermore, three connected transformers have been rehabilitated, repaired and re-connected step by step.
Supply of various cables to the local energy utility in Rwanda for use in energy supply.
Working partnership between the companies Achelis and Ossberger for the upgrade of the existing hydropower turbine and installation of a second turbine with the same output capacity in Rwanda in order to double the capacity of the hydropower station. The project included construction work, supply of materials, and the installation and commissioning of the turbines.
Supply and installation of material for the construction of overland lines in 4 industrial estates in Rwanda, measuring up to 14 km in length. Draft planning and demand analysis for medium-voltage transmission lines and low-voltage distribution lines, supply of the required materials, installation of the plant, erection of the medium and low-voltage lines, household connections and commissioning.