Supply and installation of material for the construction of overland lines in 4 industrial estates in Rwanda, measuring up to 14 km in length. Draft planning and demand analysis for medium-voltage transmission lines and low-voltage distribution lines, supply of the required materials, installation of the plant, erection of the medium and low-voltage lines, household connections and commissioning.